The Lead and Copper Rule Improvements (LCRI) require community and non-transient non-community water systems to replace lead and galvanized-requiring-replacement service lines within 10 years, submit a baseline service line inventory and replacement plan by November 1, 2027, and act at a lower lead action level of 0.010 mg/L (10 ppb). EPA published the final rule on October 30, 2024.
What the LCRI is
The Lead and Copper Rule Improvements amend the federal drinking water regulations for lead and copper in 40 CFR Part 141, Subpart I. EPA describes the rule as building on the 2021 Lead and Copper Rule Revisions (LCRR), which modified the original 1991 rule. According to EPA's technical fact sheet for states and water systems, the LCRI strengthens five areas:
- achieving lead pipe replacement within 10 years;
- locating legacy lead pipes;
- improving tap sampling;
- lowering the lead action level;
- strengthening protections to reduce lead exposure.
The rule is part of a wider body of water utility obligations. For how water and wastewater work fits into one operational record with public works and public safety, see water and wastewater.
Key dates
| Date | Requirement |
|---|---|
| October 16, 2024 | Initial service line inventory due under the 2021 LCRR, which the LCRI carries forward. |
| October 30, 2024 | Final LCRI published in the Federal Register. |
| November 1, 2027 | LCRI compliance date. Baseline service line inventory (including connectors) and service line replacement plan due to the state. Lower lead action level applies. |
| Within 10 years of the compliance date | Full replacement of lead and galvanized-requiring-replacement service lines under the system's control, unless a shorter state deadline or a deferred deadline applies. |
The rule is being challenged in American Water Works Association v. EPA (D.C. Circuit No. 24-1376). As of this page's update date, EPA's published materials still use the November 1, 2027 compliance date. Confirm the current status with your state primacy agency.
Service line inventory requirements
The LCRI keeps the LCRR's initial inventory and adds a baseline inventory. EPA's fact sheet lists what systems must do:
- update the inventory with service line information and the location of connectors, reviewing specific sources of information for connector materials;
- validate the accuracy of the non-lead category;
- notify customers and people served by lead, galvanized-requiring-replacement or lead-status-unknown lines;
- update the inventory annually and submit updates to the state, including totals of lead, galvanized-requiring-replacement, non-lead and unknown lines, lead and unknown connectors, and lines fully and partially replaced in each preceding year;
- identify a street address, or another locational identifier such as GPS coordinates or an intersection, for each service line and connector;
- identify the material of every unknown service line by the replacement deadline;
- make the inventory publicly accessible. Systems serving more than 50,000 people must make it available online.
A galvanized requiring replacement line is a galvanized service line that is, or ever was, downstream of a lead service line, or is currently downstream of a line of unknown material. A line is under the system's control wherever the system has legal or physical access to replace it fully.
Service line replacement plan
The replacement plan is due to the state by November 1, 2027 and must be publicly accessible (posted online for systems serving more than 50,000 people). EPA's fact sheet lists eight required elements:
- Unknowns. A strategy for identifying unknown service lines.
- Procedure. A standard operating procedure for full service line replacement.
- Notice before work. How consumers and customers are informed before full or partial replacement.
- Flushing. A procedure for flushing service lines and premise plumbing.
- Prioritization. How replacements are prioritized, including known lead lines and community-specific factors such as sensitive populations.
- Funding. The funding strategy.
- Program communication. How residential and non-residential customers are told about the plan.
- Legal access. State and local laws and water tariff agreements that affect access for full replacement.
Partial replacements are prohibited except during emergency repairs or planned infrastructure work that affects service lines, and they trigger additional protective measures. After a replacement or certain disturbances to lead, galvanized-requiring-replacement or unknown lines, systems must provide certified pitcher filters or point-of-use devices.
Tap sampling changes
- Samples must come from sites served by lead service lines or lead premise plumbing where available; the tiering criteria now place these sites in Tiers 1 and 2.
- Systems with lead service lines collect a first-liter and fifth-liter paired sample at lead service line sites and use the higher value for the 90th percentile.
- Sampling instructions may not recommend aerator cleaning or removal, or pre-stagnation flushing.
- Samples must be collected in wide-mouth bottles with an inner mouth diameter of at least 40 millimeters.
- Systems with lead or galvanized-requiring-replacement lines conduct standard six-month monitoring; reduced monitoring depends on results after November 1, 2027.
The lower action level
The LCRI lowers the lead action level from 0.015 mg/L to 0.010 mg/L. The copper action level remains 1.3 mg/L. A system that exceeds the lead action level must carry out public education to reduce exposure, and EPA's fact sheet describes added requirements for systems with multiple exceedances in a rolling five-year period, including making filters available to consumers.
Records that make compliance manageable
The LCRI is a records problem as much as an engineering one. The inventory, the replacement plan, customer notices, sampling sites and results, and the yearly counts all depend on knowing, line by line, what is in the ground and what has been done to it. The practical steps:
- Keep each service line and connector as an asset with its material, the evidence behind the classification and its location.
- Tie every replacement, disturbance, notice and filter delivery to the asset and the date.
- Track sampling sites by tier, with the paired first- and fifth-liter results.
- Produce the annual totals the state needs from the records, not from a separate spreadsheet.
How Elarchon helps
Elarchon's GIS Asset Registry holds every pipe and valve with its history on the map, Work Orders carry each replacement from request to completed work with labor, parts and photos, and Water Quality & Sampling keeps sampling schedules, lab results and compliance reporting. Because they share one record, the inventory, the replacement history and the sampling results stay consistent. Your state primacy agency and certified laboratory remain the authorities on what you must sample and report.
Related: the Consumer Confidence Report, which the LCRI also affects.
Questions
What is the Lead and Copper Rule Improvements (LCRI)?
The LCRI is EPA's final rule, published in the Federal Register on October 30, 2024, that amends the National Primary Drinking Water Regulations for lead and copper. It builds on the 2021 Lead and Copper Rule Revisions and focuses on replacing lead pipes within 10 years, locating legacy lead pipes, improving tap sampling, lowering the lead action level and strengthening protections.
When do water systems have to comply with the LCRI?
EPA's technical fact sheet sets November 1, 2027 as the compliance date for the main requirements, including the baseline service line inventory and the service line replacement plan. Until then, systems continue to comply with the applicable provisions of the earlier rules. The rule is under legal challenge (AWWA v. EPA, D.C. Circuit No. 24-1376), so watch for any change to the dates.
What is the new lead action level?
The LCRI lowers the lead action level from 0.015 mg/L (15 ppb) to 0.010 mg/L (10 ppb). The copper action level stays at 1.3 mg/L.
What is a lead service line inventory?
A record of every service line in the system and its material: lead, galvanized requiring replacement, non-lead or unknown. The LCRI requires an updated baseline inventory, including connectors, by November 1, 2027, annual updates to the state, and a publicly accessible inventory. Systems serving more than 50,000 people must post it online.
How long do systems have to replace lead service lines?
Ten years or less for lead and galvanized-requiring-replacement lines under the system's control, with limited exceptions. States must set shorter deadlines where feasible, and systems with a high proportion of lead lines may qualify for deferred deadlines.
What changes in lead tap sampling?
Systems with lead service lines must collect a first-liter and a fifth-liter sample at lead service line sites and use the higher value in the 90th percentile calculation. Instructions may no longer recommend aerator removal or pre-stagnation flushing, and wide-mouth bottles are required.
Sources
- Lead and Copper Rule Improvements U.S. Environmental Protection Agency
- National Primary Drinking Water Regulations for Lead and Copper: Improvements (LCRI), final rule Federal Register
- Final LCRI technical fact sheet: States and public water systems (October 2024) U.S. Environmental Protection Agency
- LCRI supporting materials U.S. Environmental Protection Agency
- 40 CFR Part 141, Subpart I: Control of lead and copper eCFR
- American Water Works Association v. EPA, No. 24-1376 (D.C. Cir.) Justia Dockets