An after action report template in the HSEEP format has two parts. The after-action report covers the exercise overview, each objective's capability performance rating (P, S, M or U), strengths and areas for improvement with root cause analysis. The improvement plan assigns each area for improvement a corrective action, responsible organization, point of contact, start date and completion date.
How the AAR/IP works
Under the Homeland Security Exercise and Evaluation Program (HSEEP), the after-action report and improvement plan (AAR/IP) align exercise objectives with preparedness doctrine. They record the information needed for preparedness reporting and trend analysis. The report states problems; the improvement plan assigns fixes. Keeping the two separate is deliberate. HSEEP's template asks that an area for improvement "clearly state the problem or gap" and not include the recommendation, which belongs in the improvement plan.
Step 1: the hotwash
Hold a hotwash immediately after the exercise or incident, while observations are fresh. A facilitator typically walks through each functional area, asking what went well and what could be improved, while a note-taker records the discussion. FEMA's training notes that information gathered in a hot wash can feed the AAR/IP process. Collect evaluator notes, ICS 214 activity logs and EOC records at the same time.
The after action report template
The structure below follows the HSEEP AAR/IP template (Rev. 2020). Replace the bracketed text.
Title page
[Exercise or incident name] · After-Action Report/Improvement Plan · [Date]
Exercise overview
| Exercise name | [Formal name, matching the document header] |
| Exercise dates | [Start and end dates] |
| Scope | This exercise is a [exercise type], planned for [duration] at [location]. Exercise play is limited to [parameters]. |
| Focus area(s) | [Prevention, Protection, Mitigation, Response and/or Recovery] |
| Capabilities | [Capabilities being exercised] |
| Objectives | [Exercise objectives] |
| Threat or hazard | [e.g. natural/hurricane, technological/radiological release] |
| Scenario | [Brief overview of the scenario and its impacts, 2–3 sentences] |
| Sponsor | [Sponsor organization and any grant programs used] |
| Participating organizations | [Number of participants and level: federal, state, local, tribal, NGO, international; full list in Appendix B] |
| Point of contact | [Name, title, agency, address, phone, email of the exercise director or sponsor] |
Analysis of capabilities: summary table
| Objective | Capability | P | S | M | U |
|---|---|---|---|---|---|
| [Objective 1] | [Capability] | ||||
| [Objective 2] | [Capability] | ||||
| [Objective 3] | [Capability] |
Rating definitions, from the HSEEP template:
- Performed without Challenges (P): the targets and critical tasks were completed in a way that achieved the objectives. Performance did not negatively affect other activities, did not add health or safety risks for the public or emergency workers, and followed applicable plans, policies, procedures, regulations and laws.
- Performed with Some Challenges (S): as above, but opportunities to improve effectiveness or efficiency were identified.
- Performed with Major Challenges (M): the objectives were achieved, but performance negatively affected other activities, added health or safety risks, and/or did not follow applicable plans, policies, procedures, regulations or laws.
- Unable to be Performed (U): the targets and critical tasks were not performed in a way that achieved the objectives.
Objective and capability narrative (repeat for each)
[Objective 1] · [Capability 1]
Strengths. The [full or partial] capability level can be attributed to the following strengths:
- Strength 1: [Observation statement]
- Strength 2: [Observation statement]
Areas for improvement. The following areas require improvement to achieve the full capability level:
- Area for Improvement 1: [Observation statement: the problem or gap only, without the recommendation]
- Reference: [Relevant plans, policies, procedures, regulations or laws]
- Analysis: [Root cause, or why the full capability level was not achieved]
Appendix A: improvement plan
| Capability | Issue / area for improvement | Corrective action | Capability element | Primary responsible organization | Organization POC | Start date | Completion date |
|---|---|---|---|---|---|---|---|
| Capability 1: [Name] | 1. [Area for improvement] | [Corrective action 1] | [Planning, organization, equipment, training or exercises] | [Organization] | [Name] | [Date] | [Date] |
| Capability 1: [Name] | 1. [Area for improvement] | [Corrective action 2] | |||||
| Capability 2: [Name] | 1. [Area for improvement] | [Corrective action 1] |
This IP is developed specifically for [organization or jurisdiction] as a result of [exercise name] conducted on [date].
Appendix B: exercise participants
List participating organizations by level: federal, state, each local jurisdiction, tribal, nongovernmental and private sector.
Adapting the template for a real incident
- Replace "exercise overview" with an incident overview: dates, type, area affected, declaration status, agencies involved.
- Use the incident objectives (from the ICS 202 or EOC objectives) in place of exercise objectives.
- Build the timeline from activity logs, situation reports and dispatch records.
- Include documentation and cost recovery as a capability, so gaps in recording labor, equipment and damage are tracked to correction.
Writing findings that lead to change
- State observations as facts. "Resource requests from Division B waited an average of two hours for approval" beats "resource requests were slow."
- Find the root cause. Ask why until the answer is something the organization can change: a plan, a procedure, a staffing level, training or equipment.
- Give every corrective action an owner and a date. An improvement plan without owners is a list of wishes.
- Track to completion. Review open corrective actions at a set interval, and test fixes in the next exercise. Accreditation assessors look for this loop; see EMAP accreditation.
How Elarchon helps
An AAR is only as good as the record behind it. With Elarchon, incident activity, resource requests, staff and equipment hours and damage reports are captured on one record across departments as the event happens. The report builder can produce the timeline and the numbers for the AAR without anyone reconstructing them. See emergency management.
Questions
What is an after action report?
An after-action report (AAR) documents how an exercise or incident went: what was intended, what happened, what worked, what didn't and why. Under HSEEP it is paired with an improvement plan (IP) that assigns corrective actions, owners and dates. Together they form the AAR/IP.
What is HSEEP?
The Homeland Security Exercise and Evaluation Program is FEMA's doctrine for designing, conducting and evaluating exercises. The current doctrine was revised in January 2020.
What are the HSEEP performance ratings?
Performed without Challenges (P), Performed with Some Challenges (S), Performed with Major Challenges (M), and Unable to be Performed (U), assigned to each capability aligned with an exercise objective.
What is a hotwash?
A facilitated discussion held immediately after an exercise or incident, while observations are fresh, to capture participants' strengths and areas for improvement. FEMA's training notes that information gathered in a hot wash can be used in the AAR/IP process.
Can the AAR/IP template be used for real incidents?
Yes. The HSEEP template is written for exercises, but many jurisdictions adapt it for real incidents, replacing exercise objectives with incident objectives and the scenario with an incident summary.
Where is the official HSEEP template?
FEMA distributes HSEEP templates through its HSEEP resources on the Preparedness Toolkit, and state agencies host copies. The template on this page follows the Rev. 2020 HSEEP AAR/IP structure.
Sources
- Homeland Security Exercise and Evaluation Program (HSEEP) Doctrine, 2020 FEMA
- HSEEP After-Action Report/Improvement Plan template (Rev. 2020) Missouri State Emergency Management Agency
- HSEEP Information Sheet FEMA
- Hot wash and the AAR/IP (independent study course) FEMA Emergency Management Institute