ELARCHON Request a briefing

Emergency management

ICS 214 Activity Log: block-by-block guide and example

The ICS 214 records the notable activities of a unit, resource or position during an operational period. It is the most widely used ICS form and a primary source for after-action reports and cost documentation.

Updated November 21, 2026 · Reviewed against 4 official and primary sources · Editorial standards

The ICS 214 Activity Log records the notable activities of a person, unit or resource during one operational period: who was assigned, and a timed list of what happened. It has eight blocks. Completed forms go to the supervisor and then to the Documentation Unit, which keeps the incident's file of ICS 214s.

What the ICS 214 is for

According to FEMA's instructions, the ICS 214 "records details of notable activities at any ICS level, including single resources, equipment, Task Forces, etc." The logs provide basic documentation of incident activity and serve as a reference for any after-action report. It is part of the ICS forms set published in the NIMS ICS Forms Booklet (FEMA 502-2).

Anyone in an ICS position can start and keep an ICS 214 as needed. It is used in field units, command and general staff positions, and EOC sections alike. Personnel should document how incident activities are occurring and progressing, plus any notable events or communications.

The eight blocks, explained

The form is two pages: page 1 holds blocks 1–8, and page 2 continues the activity log. FEMA notes it can be printed two-sided and that extra copies can be used as continuation sheets, with page numbers.

BlockTitleWhat to enter
1Incident NameThe name assigned to the incident.
2Operational Period (Date and Time From / To)Start date (month/day/year) and time (24-hour clock), and end date and time of the operational period the form covers.
3NameThe title of the organizational unit or resource designator, for example Facilities Unit, Safety Officer or Strike Team.
4ICS PositionThe name and ICS position of the individual in charge of the unit.
5Home Agency (and Unit)The home agency of the person completing the form, and a unit designator if the jurisdiction uses one.
6Resources Assigned (Name, ICS Position, Home Agency and Unit)Each resource assigned. For individuals, at least first initial and last name; a cell number is optional. Then the ICS position (e.g. Finance Section Chief) and home agency or unit (e.g. a city public works department, water management unit).
7Activity Log (Date/Time, Notable Activities)Time (24-hour clock) and a brief description of each notable activity; add the date if the period spans more than one day. Examples: task assignments, task completions, injuries, difficulties encountered. Columns such as "Action Required", "Delegated To" or "Status" may be added.
8Prepared by (Name, Position/Title, Signature, Date/Time)Name, ICS position or title, and signature of the preparer, with the date and time prepared.

A completed ICS 214 example

The example below is illustrative: a public works strike team clearing roads after a windstorm. It shows the level of detail that makes an activity log useful later, both for the after-action review and as supporting documentation for disaster cost recovery.

1. Incident NameNorth County Windstorm
2. Operational PeriodFrom 03/14 0700 to 03/14 1900
3. NamePublic Works Strike Team 2 (Debris)
4. ICS PositionJ. Alvarez, Strike Team Leader
5. Home Agency (and Unit)City Public Works, Streets Division
6. Resources AssignedR. Chen, Equipment Operator, Streets Division · M. Ortiz, Laborer, Streets Division · T. Banks, Laborer, Parks Division · Loader L-14 and dump truck D-22, Fleet
7. Date/TimeNotable activities
0700Briefing at staging. Assigned to clear Oak Ave from 1st St to 9th St. Safety message: treat all downed lines as energized; stay clear until the utility confirms they are de-energized.
0745On scene Oak Ave and 1st St. Two trees across both lanes. Requested utility check on line at 3rd St via Division A.
0930Utility confirmed line at 3rd St de-energized. Began clearing 3rd–5th St.
1215Oak Ave 1st–5th St open to one lane. Three loads hauled to temporary debris site, County Fairgrounds lot B.
1340Laborer T. Banks minor hand laceration; treated on scene by Medic 7, returned to work. Reported to Safety Officer.
1610Loader L-14 hydraulic leak; out of service. Requested replacement through Logistics.
1845Oak Ave 1st–9th St open both lanes. Seven loads total to Fairgrounds lot B. Released to staging.

8. Prepared by: J. Alvarez, Strike Team Leader, signature, 03/14 1900.

Writing entries that hold up later

  1. Time every entry. Use the 24-hour clock. A log without times cannot be reconciled with timesheets, equipment hours or radio logs.
  2. Record facts, not conclusions. "Two trees across both lanes" is more useful than "road impassable".
  3. Name places precisely. Street segments, addresses or coordinates let the activity be tied to a damage site later.
  4. Log changes to resources. Arrivals, departures, injuries and equipment out of service all affect cost and accountability records.
  5. Note requests and who received them. Requests to Logistics, the utility or Division supervisors show the coordination trail.
  6. Close the period. Sign, date and hand the form to your supervisor at the end of every operational period.

Electronic and digital ICS 214s

FEMA publishes the ICS 214 as a fillable PDF on its ICS Resource Center. Many agencies now keep activity logs in software instead of on paper. FEMA's forms guidance encourages agencies to keep the essential data elements intact. If a form is adapted, the guidance asks that the adaptation be clearly labeled, and that any added fields be numbered so they are distinguishable from the standard blocks.

An electronic log should be able to produce the standard ICS 214 layout for the Documentation Unit, keep entries time-stamped and unedited after submission, and attach the resources listed in block 6.

From activity log to recovery records

After a declared disaster, the activity log is one of several records that show what work was done, by whom, where and when. FEMA Public Assistance also requires detailed cost records: names, hours, pay rates and work descriptions for force account labor, and hours operated for equipment. Logs that name the work site and the resources assigned make those records far easier to reconcile. See force account labor and equipment and the after-action report template.

How Elarchon helps

In Elarchon, labor, equipment and materials are captured while the work happens and tied to the dates, sites and work categories they belong to, on the same record every department uses. The activity your crews record during an event is already organized when it is needed for the after-action review or a Public Assistance claim. See emergency management.

Questions

What is the ICS 214 used for?

The Activity Log (ICS 214) records details of notable activities at any ICS level, including single resources, equipment and task forces. FEMA describes it as basic incident activity documentation and a reference for any after-action report.

Who fills out the ICS 214?

Personnel in any ICS position can initiate and maintain one as needed. The form's instructions list its typical preparers as all sections and units.

Where does a completed ICS 214 go?

Completed ICS 214s are submitted to supervisors, who forward them to the Documentation Unit. All completed originals go to the Documentation Unit, which keeps the file. FEMA recommends individuals keep a copy for their own records.

Can the ICS 214 be electronic?

Yes. FEMA publishes the form as a PDF, and agencies commonly keep it electronically. What matters is that the blocks and their information are preserved. If you adapt the form, FEMA's guidance asks that adaptations be clearly labeled as such.

How detailed should ICS 214 entries be?

Brief, timed entries of notable occurrences: task assignments, task completions, injuries, difficulties encountered and significant communications. Use the 24-hour clock, and add the date when the operational period covers more than one day.

Does the ICS 214 help with FEMA reimbursement?

It can support it. Activity logs help show who did what work, when and where. FEMA Public Assistance also requires its own cost documentation, such as timesheets, pay policies and equipment hours. See force account labor and equipment.

Sources

  1. ICS Form 214, Activity Log (v3.1) FEMA
  2. ICS Forms, ICS Resource Center FEMA Emergency Management Institute
  3. ICS Forms: Introduction and Forms List (v3) FEMA
  4. NIMS ICS Forms Booklet, FEMA 502-2 FEMA

Request a briefing

See Elarchon configured for your jurisdiction.

Briefings are prepared around your departments, incident types and reporting obligations.

Request a briefing