ELARCHON Request a briefing

FEMA Public Assistance

Force account labor and equipment: documenting it for FEMA

Force account is FEMA's term for work performed by an applicant's own employees using its own equipment. It is often the largest share of emergency-work costs, and the share most often reduced for lack of documentation.

Updated November 21, 2026 · Reviewed against 8 official and primary sources · Editorial standards

Force account labor and equipment are the hours worked by an applicant's own employees and the hours its own equipment operated on eligible disaster work. FEMA reimburses labor at actual pay and fringe benefit rates and equipment at established or FEMA schedule rates, under 44 CFR 206.228.

A claim holds up when each hour can be traced to an employee or machine, a date, a site, a category of work and a pay or equipment rate.

Force account labor

What is eligible

The rules differ between emergency work and permanent work. Under 44 CFR 206.228(a)(2), the straight-time (regular) salaries and benefits of permanently employed staff are eligible when calculating the cost of permanent repair, restoration and replacement. They are not eligible for emergency protective measures, except for specific cases such as host-state evacuation and sheltering. The Public Assistance Program and Policy Guide (PAPPG) explains how overtime, temporary and seasonal staff, and premium pay are treated, and how the applicant's own written pay policy applies.

That distinction is why labor needs to be recorded against the category of work it supports. The same crew on the same day may clear debris (Category A), staff a road closure (Category B) and begin a permanent repair (Category C), and each hour is treated differently.

What the labor record has to show

FEMA's force account labor summary, available with the other Public Assistance templates and forms, asks for detail that is difficult to reconstruct after the fact. For each employee and each day, keep:

FieldWhy it matters
Employee name and job titleTies the hours to a real person and position on payroll.
Employment typePermanent, temporary, seasonal or contract status changes what is eligible.
Date and hours workedSeparated into regular and overtime hours.
Pay rate and fringe benefit rateActual rates from payroll, with the fringe calculation supported.
Site and description of workPlaces the hours on a specific project and category of work.
Supporting recordsTimesheets, payroll registers and the pay policy in effect before the disaster.

Hours that do not reconcile across timesheets, payroll and activity logs are a common reason labor costs are reduced. Record hours once, at the source, and let payroll and the FEMA summary draw from the same record.

Force account equipment

Which rates apply

44 CFR 206.228(a)(1) sets the order of preference for applicant-owned equipment:

The FEMA Schedule of Equipment Rates

FEMA publishes a Schedule of Equipment Rates that lists hourly rates by equipment type and size. The 2025 schedule applies to major disasters and emergencies declared on or after July 1, 2025. Disasters declared earlier use the schedule in effect on their declaration date, so keep the schedule version with the claim.

FEMA builds the schedule rates from all the costs of owning and operating the equipment, except operator labor. The operator's time is claimed as force account labor, on the labor record.

Equipment not listed on the schedule can be given a rate by FEMA on request.

What the equipment record has to show

Materials and mutual aid

Materials and supplies drawn from inventory or purchased for the response need the item, quantity, unit cost, source and the site where they were used. Mutual aid resources follow the same logic. FEMA's NIMS Guideline for Mutual Aid explains that an agreement may be written or verbal, and that the requesting entity needs a record of the resources requested and received and their labor, equipment and supply costs.

The fields FEMA's labor, equipment and materials summary records ask for are laid out on FEMA force account summary forms.

A practical checklist before the next event

  1. Adopt or confirm your pay policy. FEMA looks at the policy in effect before the disaster when evaluating overtime and premium pay.
  2. Pre-load your roster and equipment list. Employees, job titles, rates, and every piece of equipment with its schedule match.
  3. Record by site and category from the first shift. Hours without a location and a task cannot be assigned to a project.
  4. Separate emergency and permanent work. The same crew can do both in one day. Record them as separate entries.
  5. Reconcile daily. Compare labor, equipment and payroll while memories are fresh.
  6. Retain everything. Keep records for at least three years from the final financial report under 2 CFR 200.334, and longer while any audit or claim is open.

How Elarchon records force account work

In Elarchon, crews and equipment are recorded where the work happens, in the same operational record that fire, EMS, public works and utilities already use. Labor, equipment and materials are tied to the dates, sites and work categories they belong to from the first hour. Time and payroll export, the FEMA Public Assistance app and Mutual Aid Hours work from that record, so the summaries are built from source entries rather than re-keyed from timesheets.

Elarchon does not determine eligibility or guarantee reimbursement. FEMA makes those determinations under its regulations and the PAPPG.

Questions

What is force account labor?

Force account labor is work performed by an applicant's own employees, as opposed to contractors or mutual aid. FEMA reimburses eligible force account labor at the employee's actual pay and fringe benefit rates, subject to the rules in 44 CFR 206.228 and the Public Assistance Program and Policy Guide.

Is regular-time pay eligible for emergency work?

Generally not. Under 44 CFR 206.228(a)(2), the straight-time salaries and benefits of permanently employed staff are eligible for permanent work but not for emergency protective measures, with limited exceptions. The Public Assistance Program and Policy Guide explains how overtime and other premium pay are treated.

Which FEMA equipment rates apply to a 2025 or 2026 disaster?

FEMA's 2025 Schedule of Equipment Rates applies to major disasters and emergencies declared on or after July 1, 2025. Check FEMA's Schedule of Equipment Rates page for any newer schedule and for the declaration date it applies from.

How are FEMA equipment rates calculated?

FEMA sets schedule rates from all the costs of owning and operating each type of equipment, except operator labor. The operator's time is claimed separately as labor.

Can we use our own equipment rates instead of FEMA's?

Sometimes. 44 CFR 206.228(a)(1) allows reasonable rates established under state guidelines, and locally established rates up to the FEMA schedule rate. Rates above the FEMA schedule require documentation and FEMA approval. Where an applicant has no established rates, the FEMA schedule applies.

Do equipment hours include standby time?

FEMA reimburses equipment for the time it is actually operating on eligible work. Record operating hours by site and task, not hours on site or days assigned.

Sources

  1. 44 CFR 206.228: Allowable costs eCFR
  2. Schedule of Equipment Rates FEMA
  3. 2025 Schedule of Equipment Rates (PDF) FEMA
  4. Public Assistance Project Templates and Forms FEMA
  5. Public Assistance Program and Policy Guide, Version 5.0 (amended) FEMA
  6. NIMS Guideline for Mutual Aid FEMA, March 2024
  7. 2 CFR Part 200, Subpart E: Cost Principles eCFR
  8. 2 CFR 200.334: Record retention requirements eCFR

Request a briefing

See Elarchon configured for your jurisdiction.

Briefings are prepared around your departments, incident types and reporting obligations.

Request a briefing