FEMA force account summary forms

How to complete FEMA's Force Account Labor, Equipment and Materials Summary Records, and the source records each line must trace back to.

Updated November 21, 2026 · Reviewed against 8 official and primary sources · Editorial standards

FEMA's force account summary records summarize an applicant's own costs for one Public Assistance project: the Labor Summary Record lists each employee's dates, hours, pay rates and benefits; the Equipment Summary Record lists each piece of equipment, its rate and hours operated; and the Materials Summary Record lists each purchase or stock item with vendor, quantity, price and dates. Every line must trace back to timesheets, payroll, equipment logs and invoices.

Before you start

Common header fields

Each summary record identifies the project. Typical header fields:

FieldWhat to enter
ApplicantLegal name of the applicant organization.
PA IDThe applicant's Public Assistance identification number.
Disaster numberFEMA declaration number (e.g. DR-XXXX-ST).
Project numberThe project or Project Worksheet number, once assigned.
Category of workA–G. See categories of work.
Location / siteAddress or description of where the work was done.
Description of workBrief description of the work the costs relate to.
Period coveringFirst and last dates of the work the form summarizes.

Force Account Labor Summary Record

One row per employee per period. Copyable layout:

NameJob titleDates workedRegular hoursRegular rateOvertime hoursOvertime rateFringe benefit rateTotal cost

Force Account Equipment Summary Record

One row per piece of equipment per period. Copyable layout:

Equipment typeEquipment code / rate sourceSize, capacity or horsepowerOperatorDates usedHours operatedRate per hourTotal cost

Materials Summary Record

One row per purchase or stock issue. Copyable layout:

VendorDescriptionQuantityUnit priceTotal priceDate purchasedDate usedInvoice / stock number

Reconciliation checks before you submit

  1. Hours reconcile. Labor hours match timesheets, and timesheets match payroll for the same days.
  2. No double counting. No employee's hours appear on two projects for the same time.
  3. Operators match. Every equipment row with an operator has a matching labor entry.
  4. Rates are documented. Every equipment rate and every fringe rate has its source on file.
  5. Totals tie out. Summary totals equal the sum of the source records.

Filling the forms from records made at the time

Most force account problems come from reconstructing hours weeks after the event. In Elarchon, crews record labor and equipment use during the work, tied to the site and category of work, so the summaries can be produced from the operational record rather than rebuilt from memory. Elarchon is not affiliated with FEMA and does not determine eligibility or guarantee reimbursement.

Questions

What is the FEMA Force Account Labor Summary Record?

A FEMA Public Assistance form that summarizes, for one project, the applicant's own employees who worked on eligible disaster work: who they are, when and how long they worked, their pay rates and benefits, and the total cost, with a certification that the figures come from payroll records.

Where do I get the current FEMA force account forms?

From FEMA's Public Assistance templates and forms page. Form numbers and editions change; the labor summary has been issued as FEMA Form FF-104-FY-21-137 (formerly 009-0-123) and the equipment summary as FF-104-FY-21-141. Always download the current edition.

Do I have to use FEMA's force account forms?

FEMA provides the summary records as templates. Applicants may present the same information in another format, but they must keep the source records (timesheets, payroll, equipment logs, invoices) that support every line.

How are equipment costs calculated on the summary?

Hours the equipment actually operated, multiplied by the applicable rate: FEMA's Schedule of Equipment Rates for the declaration period, or approved state or local rates. Operator labor is not included in the equipment rate and is claimed on the labor summary.

Should regular time and overtime be separated?

Yes. Record regular and overtime hours and rates separately for each employee. FEMA eligibility for regular-time labor differs between emergency and permanent work, so the split matters. Check the PAPPG for the rules that apply to your work.

Sources

  1. Public Assistance templates and forms FEMA
  2. Schedule of Equipment Rates FEMA
  3. 2025 Schedule of Equipment Rates (PDF) FEMA
  4. 44 CFR 206.228 Allowable costs eCFR
  5. Public Assistance Program and Policy Guide, Version 5.0 Federal Register
  6. Force Account Labor Summary Record (FF-104-FY-21-137), copy hosted by University of Florida University of Florida
  7. Materials Summary Record, copy hosted by University of Florida University of Florida
  8. IS-1006: Force account overview FEMA Emergency Management Institute

Request a briefing

See Elarchon configured for your jurisdiction.

Briefings are prepared around your departments, incident types and reporting obligations.

Request a briefing