Every dollar of Public Assistance flows through a project. The project worksheet defines what was damaged, what work is eligible and what it costs, and it is the document every later decision refers back to.

Updated November 21, 2026 · Reviewed against 8 official and primary sources · Editorial standards

A FEMA project worksheet (FEMA Form 90-91) is the Public Assistance document that records a project's eligible scope of work and its quantitative cost estimate (44 CFR 206.202(d)). Projects are now developed in FEMA's Grants Portal from the applicant's damage inventory, the Damage Description and Dimensions, the scope of work and the cost estimate; once approved, FEMA has 45 days to obligate funds.

Projects are the unit of funding in FEMA Public Assistance. Each project groups related damage or work, often by site, facility or category of work, and carries its own scope, cost, conditions and deadlines through to closeout.

Where a project comes from

  1. Request for Public Assistance. The applicant becomes eligible to submit projects. See Request for Public Assistance.
  2. Recovery Scoping Meeting. The first substantive meeting starts the applicant's 60 days to identify and report damage (44 CFR 206.202(d)(1)(ii)).
  3. Damage inventory. The applicant lists every damaged site or work activity. FEMA uses it to group items into projects and plan site inspections.
  4. Damage Description and Dimensions. For each site, the cause, location and measurements of damage, reviewed and signed by the applicant in Grants Portal.
  5. Scope of work and cost estimate. The eligible work to restore the facility, and its cost.
  6. Review and obligation. FEMA reviews eligibility, insurance, environmental and historic preservation compliance, and obligates the federal share to the state.

What a project contains

ElementWhat it recordsWhy it matters
Applicant and facilityWho owns or is responsible for the facility, and its locationLegal responsibility is a basic eligibility test
Category of workA through G, or Z for management costsDetermines rules, deadlines and documentation. See categories of work
Damage Description and DimensionsCause, location and measurements of damageScope and cost are derived from it
Scope of workThe eligible work to restore pre-disaster design and function, with applicable codes and standardsWork outside the approved scope is not funded
Cost estimateLabor, equipment, materials, contracts, by line itemSmall projects are paid on it; large projects are reconciled against it
Hazard mitigationSection 406 measures, if anyMust be identified before repair. See 406 hazard mitigation
InsuranceCoverage, recoveries and obtain-and-maintain requirementsReduces eligible cost. See insurance requirements
Special considerationsEnvironmental, historic preservation, floodplain conditionsConditions must be met to keep funding

Small and large projects

The approved estimate decides how a project is paid (44 CFR 206.203(c)). Projects below the small project threshold, $1,130,900 for declarations on or after October 1, 2026, are paid on the approved estimate. Projects at or above it are paid on documented actual costs. Projects below the minimum, $4,300 for the same period, are not approved. See thresholds.

Completed and work-to-be-completed projects

Emergency work is usually complete by the time the project is written, so its cost comes from actual records: timesheets, equipment logs, invoices. Permanent work is usually written on an estimate before the work is done. The documentation for each is different:

Improved and alternate projects

An applicant may restore a facility with improvements beyond pre-disaster design (an improved project) with the state's approval, funded up to the federal share of the approved estimate. Where restoring the facility would not serve the public welfare, the state may request an alternate project; for public facilities, funding is 90 percent of the federal share of the estimate (44 CFR 206.203(d)). FEMA's IS-1000 course describes these capped project options.

Reviewing a project before you sign

How Elarchon helps

Elarchon's Damage Assessment application records damage by site, with photographs, measurements and location, and the FEMA Public Assistance application ties labor, equipment and materials to the same sites and categories of work. The damage inventory and the cost support for each project come from one record. Elarchon is not affiliated with FEMA and does not determine eligibility.

Questions

What is a FEMA project worksheet?

The project worksheet (FEMA Form 90-91) is the document that records a Public Assistance project's eligible scope of work and a quantitative cost estimate (44 CFR 206.202(d)). FEMA now develops projects in Grants Portal, but the term project worksheet is still widely used.

Who prepares the project worksheet?

FEMA or the applicant, assisted by the state as appropriate (44 CFR 206.202(d)(1)(i)). The applicant's authorized representative is responsible for ensuring all eligible work and costs are identified.

What is the Damage Description and Dimensions?

The DDD records the cause, location and dimensions of the damage to each facility. FEMA's Emergency Management Institute course IS-1007 covers how applicants review, verify and sign the DDD in Grants Portal. Scope and cost are built on it, so errors in the DDD carry through the project.

How long does FEMA have to obligate funds after a project is submitted?

Under 44 CFR 206.202(e)(2), FEMA has 45 days to obligate federal funds after the applicant submits the project worksheets, and must explain any delay to the recipient.

Is there a minimum project size?

Yes. For major disasters and emergencies declared on or after October 1, 2026, FEMA will not approve a project below $4,300. See thresholds.

Can a project worksheet be changed after approval?

Yes, through a version or amendment, for example for a change in scope or cost. Changes of scope should be approved before the work is done. Cost overruns on large projects are submitted through the recipient with documentation (44 CFR 206.204(e)).

Sources

  1. 44 CFR 206.202: Application procedures (Project Worksheets) eCFR
  2. 44 CFR 206.203: Federal grant assistance (small and large projects; improved and alternate projects) eCFR
  3. 44 CFR 206.204: Project performance eCFR
  4. IS-1007: Detailed Damage Description and Dimensions FEMA Emergency Management Institute
  5. IS-1000: Capped projects FEMA Emergency Management Institute
  6. Notice of Adjustment of Minimum Project Worksheet Amount (Nov. 6, 2026) Federal Register
  7. Public Assistance Program and Policy Guide, Version 5.0 (amended) FEMA
  8. Public Assistance Project Templates and Forms FEMA

Request a briefing

See Elarchon configured for your jurisdiction.

Briefings are prepared around your departments, incident types and reporting obligations.

Request a briefing