ELARCHON Request a briefing

Utilities guide

MS4 permit requirements for municipal stormwater programs

Municipal separate storm sewer systems (MS4s) need an NPDES permit to discharge stormwater. For small MS4s, the permit is built around six minimum control measures and a written stormwater management program.

Updated November 21, 2026 · Reviewed against 6 official and primary sources · Editorial standards

An MS4 permit is the NPDES permit that lets a municipal separate storm sewer system discharge stormwater. For small MS4s, federal rules at 40 CFR 122.34 require a written stormwater management program that implements six minimum control measures, records kept for at least three years, and annual reports for at least the first permit term. The state permitting authority sets the specific requirements.

What an MS4 is

A municipal separate storm sewer system is the network of publicly owned conveyances, such as streets, gutters, ditches, catch basins and storm drains, that collects stormwater and discharges it, untreated, to local waters. Because those discharges carry pollutants, they are regulated under the National Pollutant Discharge Elimination System (NPDES). EPA's municipal stormwater program covers large, medium and small MS4s; most cities and counties that ask about MS4 permits are small MS4s covered under a state general permit.

Stormwater work usually sits with public works or a utility. For how it fits the wider department, see water and wastewater.

The six minimum control measures

40 CFR 122.34(b) requires the permit to include requirements that the permittee implement six minimum control measures during the permit term. EPA's summary of the six measures and small MS4 overview describe them:

MeasureWhat it coversTypical records
1. Public education and outreachInforming residents and businesses about stormwater impacts and what they can do.Materials distributed, audiences reached, events.
2. Public participation and involvementInvolving the public in developing and implementing the program.Meetings, comments, volunteer activities.
3. Illicit discharge detection and eliminationA storm sewer map, an ordinance prohibiting non-stormwater discharges, and a program to find and remove illicit discharges.Outfall map, screening results, complaints, enforcement actions.
4. Construction site runoff controlA program for erosion and sediment control at construction sites, with plan review and inspection.Plan reviews, site inspections, violations.
5. Post-construction stormwater managementControls on runoff from new development and redevelopment, and long-term operation and maintenance of those controls.Inventory of structural controls, maintenance inspections.
6. Pollution prevention and good housekeepingOperation and maintenance practices for municipal operations, including staff training.Street sweeping, catch basin cleaning, facility inspections, training logs.

The permit also requires a written stormwater management program document describing how each measure is implemented, with measurable goals. EPA's compendium of permitting approaches shows how states write these requirements, which is useful when comparing your permit to others.

Evaluation, records and reporting

Why MS4 compliance is an operations problem

Most MS4 evidence is created by field crews and inspectors doing other work: sweeping streets, cleaning catch basins, inspecting construction sites, responding to a complaint about something in a ditch, maintaining a detention pond. When those activities are recorded in separate places, the annual report becomes a manual collection exercise. Treat each MS4 asset (outfall, inlet, structural control) as a mapped asset with its inspection and maintenance history, and tag work by control measure as it is done.

  1. Map the system. Outfalls, inlets and structural controls, each with an identifier.
  2. Schedule the work. Inspections and maintenance from the permit's frequencies.
  3. Record by measure. Each completed task tagged to the control measure it supports.
  4. Track complaints to closure. Illicit discharge reports through investigation and enforcement.
  5. Report from the record. Annual report figures drawn from the completed work.

How Elarchon helps

Elarchon's GIS Asset Registry keeps outfalls, inlets and controls on the map with their history, Work Orders records inspections and maintenance with labor, parts and photos, and code enforcement carries illicit discharge cases through notices and hearings on the same record. Your state permit defines what you must do and report. Related: sanitary sewer overflows.

Questions

What is an MS4 permit?

An NPDES permit that authorizes a municipal separate storm sewer system (MS4), the publicly owned conveyances that collect and carry stormwater, to discharge to waters of the United States. Most small MS4s are covered under a general permit issued by their state, which defines the specific requirements.

What are the six minimum control measures?

Public education and outreach; public participation and involvement; illicit discharge detection and elimination; construction site stormwater runoff control; post-construction stormwater management in new development and redevelopment; and pollution prevention and good housekeeping for municipal operations (40 CFR 122.34(b)).

How long must MS4 records be kept?

The permit must require the permittee to keep records required by the permit for at least 3 years and to make records, including a written description of the stormwater management program, available to the public (40 CFR 122.34(d)(2)).

Does an MS4 have to file annual reports?

Under 40 CFR 122.34(d)(3), the permittee must submit annual reports for its first permit term, unless it relies on another entity to meet its obligations. For later terms, the permitting authority sets the reporting frequency. Many state general permits continue to require annual reports.

How long does an MS4 permit last?

NPDES permits are effective for a fixed term of no more than 5 years (40 CFR 122.46(a)). Permittees reapply or seek coverage under the reissued general permit.

Who issues MS4 permits?

The NPDES permitting authority: the state, where EPA has authorized it, or EPA. Specific permit requirements are defined state by state, so the state general permit is the document to follow.

Sources

  1. Stormwater discharges from municipal sources U.S. Environmental Protection Agency
  2. Stormwater management: summary of the six minimum control measures (2025) U.S. Environmental Protection Agency
  3. Small MS4 stormwater program overview (fact sheet 2.0) U.S. Environmental Protection Agency
  4. Compendium of MS4 permitting approaches, part 1: six minimum control measures U.S. Environmental Protection Agency
  5. 40 CFR 122.34: Permit requirements for regulated small MS4 permits eCFR
  6. 40 CFR 122.46: Duration of permits eCFR

Request a briefing

See Elarchon configured for your jurisdiction.

Briefings are prepared around your departments, incident types and reporting obligations.

Request a briefing