Sanitary sewer overflows: definition, reporting and response

A sanitary sewer overflow (SSO) is a release of untreated or partially treated sewage from a municipal sanitary sewer. SSOs that reach waters of the United States are prohibited unless an NPDES permit authorizes them, and permit conditions govern how quickly they must be reported.

Updated November 21, 2026 · Reviewed against 4 official and primary sources · Editorial standards

A sanitary sewer overflow is a release of untreated or partially treated sewage from a municipal sanitary sewer, whether it reaches a waterway or spills from a manhole onto a street. Under the standard NPDES permit condition at 40 CFR 122.41(l)(6), an overflow that may endanger health or the environment must be reported orally within 24 hours and in writing within 5 days.

What counts as an SSO

EPA's sanitary sewer overflow page explains that sanitary sewers sometimes release raw sewage and that these releases are called sanitary sewer overflows. SSOs that reach waters of the United States are point source discharges. Overflows also occur from manholes onto streets, sidewalks and other land, and backups into buildings.

Common causes include:

Wastewater collection is part of the water and wastewater department; see water and wastewater.

How SSOs are regulated

Like other point source discharges from municipal sanitary sewer systems, SSOs that reach waters of the United States are prohibited unless authorized by an NPDES permit. The permit for the wastewater treatment plant and collection system carries standard conditions from 40 CFR 122.41, including the duty to properly operate and maintain the system and to report noncompliance. Many states add their own SSO reporting rules, forms and thresholds.

Reporting timeline

WhenWhatSource
Within 24 hours of becoming awareOral report of any noncompliance that may endanger health or the environment40 CFR 122.41(l)(6)(i)
Within 5 days of becoming awareWritten report describing the noncompliance, its cause, exact dates and times, expected duration if not corrected, and steps to reduce, eliminate and prevent recurrence40 CFR 122.41(l)(6)(i)
As your permit and state specifyElectronic submission of sewer overflow and bypass reports40 CFR Part 127; state permit

EPA publishes reported overflow and bypass events through its ECHO sewer overflow data, so reports become part of a public record.

What an SSO response plan should cover

Permits and state programs commonly expect a written overflow emergency response plan. Whatever your permit's exact terms, a usable plan answers these questions:

  1. Detection. How overflows are found: lift station alarms, crew observation, resident calls, 311 requests.
  2. Dispatch. Who responds, how quickly, with what equipment, around the clock.
  3. Containment. Stopping the flow, protecting storm drains and waterways, and bypass pumping.
  4. Notification. Internal chain, the permitting authority within 24 hours, public health, and public notice where required.
  5. Documentation. Start and end times, estimated volume, location, cause, receiving water, photos and corrective action.
  6. Cleanup and sampling. Cleanup, disinfection and any required sampling.
  7. Written report. Within 5 days, from the documented facts.
  8. Prevention. Root cause, follow-up work orders and changes to maintenance schedules.

Records that hold up

The written report depends on facts collected in the first hours: when the alarm came in, when the crew arrived, when the overflow stopped, how the volume was estimated and what was done. Recording them on the job, with times captured as they happen, is more reliable than reconstructing them afterward. The same records feed root-cause work, capacity planning and maintenance schedules. A standing lift station inspection checklist addresses one of the most common causes.

How Elarchon helps

Lift Station Monitoring records alarms, run times and rounds for every station, Work Orders carries the response from request to completed work with labor, parts and photos, and Resident Requests (311) captures reports from the public. Because they share one record, the overflow, the response and the follow-up stay connected. Your permit and state program define what you must report and when.

Questions

What is a sanitary sewer overflow?

EPA describes sanitary sewer overflows as releases of raw sewage from sanitary sewers. They include overflows that reach waters of the United States and overflows from manholes onto streets and other land. Common causes include blockages, line breaks, infiltration and inflow during wet weather, equipment failure such as lift station pumps, and power failures.

Are sanitary sewer overflows illegal?

SSOs that reach waters of the United States are point source discharges and, like other discharges from municipal sanitary sewer systems, are prohibited unless authorized by an NPDES permit. Overflows that do not reach waters of the U.S. can still violate permit conditions.

How fast must an SSO be reported?

Under the standard NPDES permit condition in 40 CFR 122.41(l)(6), the permittee must report any noncompliance that may endanger health or the environment orally within 24 hours of becoming aware of it, and in writing within 5 days. State permits and state law may add requirements, so follow your permit.

What should an SSO report include?

Under 122.41(l)(6), a description of the noncompliance and its cause; the period of noncompliance, including exact dates and times; if not corrected, the anticipated time it is expected to continue; and the steps taken or planned to reduce, eliminate and prevent recurrence.

What is the difference between an SSO and a CSO?

A combined sewer overflow (CSO) is a discharge from a combined system that carries both stormwater and sewage in the same pipe, which some permits authorize under defined conditions. An SSO comes from a separate sanitary sewer meant to carry only sewage.

Do SSO reports have to be submitted electronically?

EPA's NPDES Electronic Reporting Rule (40 CFR part 127) phases in electronic submission of sewer overflow and bypass event reports. Check with your permitting authority for the current requirement in your state.

Sources

  1. Sanitary sewer overflows (SSOs) U.S. Environmental Protection Agency
  2. 40 CFR 122.41: Conditions applicable to all permits eCFR
  3. 40 CFR Part 127: NPDES electronic reporting eCFR
  4. NPDES sewer overflow and bypass event data U.S. Environmental Protection Agency (ECHO)