Solid waste management software for a city should handle routes, carts and service requests every day, and scale to disaster debris when it matters most. Elarchon records municipal collection operations on the same record as public works, fleet and emergency management, so debris work after a declared disaster is documented for FEMA Public Assistance Category A as it happens.
Everyday collection
A solid waste division runs routes on a fixed schedule, manages thousands of carts and containers, and answers a steady stream of requests: missed pickups, damaged carts, bulk items, new service. Each of those is a small piece of work that needs a crew, a vehicle and a record. In Elarchon they are handled on one record with the rest of public works.
| Need | In Elarchon |
|---|---|
| Service requests | Resident Requests (311) for missed pickups, carts and bulk items. See 311 software. |
| Routes and carts | Routes, carts and containers with their service history. |
| Work | Work Orders for crews, labor hours and equipment. See work orders. |
| Vehicles | Fleet Maintenance for packers and roll-offs: PMs, fuel, downtime. See fleet. |
| Reporting | Report Builder and Command Dashboards for service and cost. |
Disaster debris
After a hurricane, flood or tornado, debris volumes can dwarf a year of ordinary collection. EPA's guidance on planning for materials and wastes from disasters recommends that communities plan in advance: estimate likely debris, identify temporary staging and separation sites, separate hazardous materials, identify reuse and recycling outlets and arrange contracts before they are needed. EPA's All-Hazards Waste Management Planning Tool walks a community through building that plan.
Debris removal is Public Assistance Category A. FEMA's eligibility rules are in 44 CFR 206.224 and the PAPPG; eligibility depends on where the debris is, who is legally responsible for removing it and why removal is necessary. Documentation typically includes where debris was picked up, quantities, the sites it went to, the crews and equipment that moved it and any contractor monitoring. See FEMA debris removal.
Recording debris work as it happens
- Incident tagging. Debris work orders are tagged to the declared incident and to Category A from the first load.
- Labor and equipment. Crew hours and equipment hours are recorded per work order, the basis of force account documentation.
- Locations. Pickup areas and staging sites are recorded on the map.
- Mutual aid. Crews and trucks from other jurisdictions are logged in Mutual Aid Hours with the agreement they came under.
Planning before the storm
EPA's management options for disaster materials and wastes follow a hierarchy that favors reuse and recycling over disposal, and its planning guidance stresses separating hazardous materials early. In practice that means knowing in advance which crews, vehicles and contractors will run debris operations, which sites will receive which materials and how loads will be counted. Keeping that plan alongside the fleet, crew and contract records that will carry it out makes the first days of recovery faster and the documentation more complete.
Questions to ask any vendor
- Can resident requests become crew work without re-entry?
- How is debris work tagged to an incident, a site and a FEMA category?
- Are crew and equipment hours captured per job, or reconstructed from timesheets later?
- Does the same record serve fleet, streets and emergency management?
Questions
What does municipal solid waste management software do?
It supports collection operations: routes, carts and containers, service requests such as missed pickups and new carts, crews and vehicles, and reporting on tonnage and service. For many cities it also supports disaster debris operations.
How does disaster debris differ from normal collection?
Debris after a disaster is far larger in volume and mixed in type, needs temporary staging sites and separation, and, if the event is declared, must be documented for FEMA Public Assistance Category A.
What does EPA recommend for disaster debris planning?
EPA recommends that communities plan for disaster materials and wastes before an incident, including staging areas, separation of hazardous waste, reuse and recycling options and pre-arranged contracts. EPA publishes an All-Hazards Waste Management Planning Tool.
Can residents report missed pickups into Elarchon?
Yes. Resident Requests (311) records the request and routes it to the crew as work, on the same record as the route and the cart.
Does Elarchon handle solid waste billing?
Elarchon's solid waste notes cover routes, carts and debris. Utility billing typically remains in the finance system; Elarchon exports service and cost data through the Open API.
How should debris staging sites be documented?
Record each temporary staging and reduction site with its location and the debris types it accepts, and log loads in and out. EPA's planning guidance recommends identifying these sites before a disaster, and FEMA reviews where debris went as part of Category A documentation.
Can solid waste crews be redeployed during an emergency on the same system?
Yes. Because crews, vehicles and work orders sit on one record with the rest of public works, a supervisor can assign solid waste crews and packers to debris or other emergency work and the hours are recorded against the incident.