A fire RMS RFP should define the department's scope, then require NERIS incident reporting, the integrations the department depends on (CAD, GIS, payroll, ePCR), agency ownership and full export of data, documented security, migration of legacy NFIRS and records data, implementation and training, a transparent pricing structure, and evaluation criteria published in advance. The outline below covers each section and can be issued to any vendor.
How to use this template
Copy the sections into your agency's solicitation format. Keep requirements testable: write "the system shall" statements, ask vendors to answer each with Yes, Partial (explain), Planned (date) or No, and require a demonstration of the items that matter most. If federal grant funds pay for the system, follow the procurement standards in 2 CFR 200.318 to 200.327 as well as state and local purchasing law. For the wider purchasing process, see how to buy government software.
1. Agency profile and scope
- Department type (career, combination, volunteer), population served, square miles, number of stations, apparatus and personnel.
- Annual incident volume by broad type; number of inspections and occupancies; EMS transport or non-transport.
- Current systems to be replaced and systems that will remain (CAD, ePCR, payroll, GIS).
- Other departments that may join the system later (EMS, emergency management, public works). State whether the city or county wants options to extend the contract to them.
- Desired go-live date and any hard deadlines, such as a grant period of performance.
2. Functional requirements
| Area | Requirements to state |
|---|---|
| Incident reporting and NERIS | Incident records structured to the current NERIS schema; supported NERIS version; submission path to NERIS in your state; handling of schema updates; validation before submission; NERIS Entity ID configuration; reporting of incidents that span multiple units and agencies. |
| Inspections and prevention | Occupancy records, inspection checklists by occupancy type, violations and re-inspections, permits, mobile inspection with offline capability, notices to owners. |
| Pre-incident planning | Building data, hazards, floor plans and photos, availability on apparatus devices. See the pre-incident plan template. |
| Hydrants and water supply | Hydrant inventory on a map, inspections, flow tests, out-of-service status shared with the water utility. |
| Apparatus and equipment | Daily checks, defects, out-of-service status, maintenance history, inventory and equipment custody. |
| Personnel | Scheduling and staffing rules, credentials and training records with expiration alerts, exposure records, time export to payroll. |
| Reporting and analytics | Standard reports (NERIS, response times against NFPA 1710 or 1720, ISO PPC supporting records, annual report figures); ad hoc report builder; dashboards for command staff. |
| Disaster cost documentation | Capture of labor, equipment and materials by incident, site and FEMA category of work, exportable to FEMA force account summaries. |
3. Integrations
- CAD: automatic creation of incident records from CAD with times, units and addresses; name the CAD product and version.
- GIS: use of the agency's GIS layers for addresses, occupancies, hydrants and response zones.
- ePCR: how fire incident and EMS patient care records relate, and how EMS data reaches the state for NEMSIS reporting.
- Payroll and HR: export of worked hours and leave in the payroll system's format.
- Open interfaces: documented API, bulk export formats, and any fees for API access.
4. Data ownership, export and retention
- The agency owns all data entered into or generated by the system.
- Full export of all records, attachments and audit logs in documented, non-proprietary formats at any time and at contract end, at no additional charge.
- Retention settings that support the agency's records retention schedule and legal holds.
- If federal grant funds are involved, retention that supports 2 CFR 200.334.
- Vendor's process for responding to public records requests and legal demands for agency data (refer to the agency; notify unless prohibited).
5. Security, privacy and accessibility
- Encryption in transit and at rest; multi-factor authentication; single sign-on with the agency's identity provider; role-based permissions; audit logs.
- Data hosting location and subprocessors.
- Independent assessments the vendor holds (for example SOC 2 report, GovRAMP or FedRAMP status) and dates; or the vendor's plan if none.
- If criminal justice information will be stored: how the vendor supports the agency under the CJIS Security Policy.
- If protected health information will be stored: willingness to sign a business associate agreement under HIPAA.
- Incident notification commitments and timelines.
- Accessibility conformance with WCAG 2.1 Level AA, the standard adopted by the U.S. Department of Justice's ADA Title II rule. Request a current accessibility conformance report.
6. Migration
- Inventory of legacy data to migrate: incidents (including NFIRS-era records), occupancies, inspections, hydrants, personnel, training, inventory.
- Vendor's approach to mapping, test migrations, validation and sign-off.
- How historical NFIRS-coded incidents will be stored and reported alongside NERIS-coded incidents. See NFIRS to NERIS.
- Parallel running period, if any, and cutover plan.
7. Implementation, training and support
- Project plan with milestones, agency responsibilities and vendor staffing.
- Configuration workshops, administrator training, train-the-trainer and end-user training across all shifts.
- Support hours, channels, severity definitions, response and resolution targets, and uptime commitment.
- Release and change management: notice of changes, sandbox environment.
8. Pricing structure
Ask every vendor to price in the same table so offers can be compared.
| Cost element | Year 1 | Year 2 | Year 3 | Years 4–5 (options) |
|---|---|---|---|---|
| Subscription or license, by module | ||||
| Implementation and configuration | n/a | n/a | n/a | |
| Data migration | n/a | n/a | n/a | |
| Integrations (CAD, GIS, payroll, other) | ||||
| Training | ||||
| Support and hosting | ||||
| Annual price increase cap | ||||
9. Evaluation criteria
Publish criteria and weights in the RFP. The weights below are an example; set your own.
| Criterion | Example weight |
|---|---|
| Functional fit, including NERIS | 30% |
| Integrations and data ownership | 15% |
| Security, privacy and accessibility | 15% |
| Implementation, migration and training approach | 15% |
| Support and references | 10% |
| Total cost over five years | 15% |
Shortlist vendors for scripted demonstrations using your own scenarios, for example: a structure fire with mutual aid, a medical call with fire first response, and a storm event with public works support.
10. Submission requirements
- Response to each requirement in the provided matrix.
- Sample contract, service level agreement and data processing terms.
- Security documentation and accessibility conformance report.
- Three references from agencies of similar size and type.
- Implementation plan and named project roles.
This template is a planning aid, not legal or procurement advice. Your purchasing office and counsel determine the solicitation format and terms. Elarchon is one of the vendors that can respond to it; see NERIS reporting software for the questions to ask every vendor.
Questions
What should a fire RMS RFP include?
Scope and agency profile, functional requirements (incidents and NERIS, inspections, preplans, hydrants, apparatus, staffing, training), integrations (CAD, GIS, payroll, ePCR), data ownership and export, security and privacy, migration of legacy data, implementation and training, support levels, a pricing structure and published evaluation criteria.
How do I make sure a vendor can report to NERIS?
Ask how incidents reach NERIS in your state: through the vendor's integration with the NERIS API or through your state program. Ask which NERIS schema version the product supports, how schema updates are delivered, and for a demonstration of a submitted incident. See NERIS reporting requirements.
Do federal procurement rules apply to a fire RMS purchase?
If the purchase is paid for with federal grant funds, such as an AFG award, the procurement standards in 2 CFR 200.318 to 200.327 apply, along with your state and local rules. Confirm with your grants office before issuing the solicitation.
Should a fire RMS RFP include accessibility requirements?
Yes. The U.S. Department of Justice's ADA Title II rule adopts WCAG 2.1 Level AA for state and local government web content and mobile apps. After an April 2026 extension, compliance dates are April 26, 2027 for entities with 50,000 or more people and April 26, 2028 for smaller entities and special districts.
How should RFP responses be scored?
Publish the criteria and weights in the RFP. A common structure scores functional fit, NERIS and integrations, security, implementation approach, support, references and total cost of ownership separately, with a demonstration round for shortlisted vendors.
Sources
- National Emergency Response Information System (NERIS) U.S. Fire Administration
- NERIS program site Fire Safety Research Institute
- 2 CFR 200.318 General procurement standards eCFR
- 2 CFR 200.320 Procurement methods eCFR
- 2 CFR 200.334 Record retention requirements eCFR
- Fact sheet: ADA Title II web and mobile accessibility rule U.S. Department of Justice
- CJIS Security Policy v6.0 FBI CJIS Division
- Summary of the HIPAA Security Rule U.S. Department of Health and Human Services