ELARCHON Request a briefing

Templates

Pre-incident plan template

A one-page preplan structure a company officer can complete on a walkthrough and a crew can read on the way to the call.

Updated November 21, 2026 · Reviewed against 2 official and primary sources · Editorial standards

A pre-incident plan template records, before an emergency, what a crew needs on arrival: the occupancy and its contacts, construction, fire protection systems and their controls, hazards, utility shutoffs, water supply, access and staging, and tactical notes, with a site plan. The template below lays out each section in the order a company officer reads it en route.

How to complete it

Fill the plan in on a walkthrough with the owner or facility manager, ideally during or after an inspection so the information matches the inspection record. Keep it to what a crew will use in the first minutes. Use photos for system controls and shutoffs. Pre-incident planning requirements, formerly NFPA 1620, now sit in NFPA 1660; your agency's policy sets which occupancies require a plan and how often it is reviewed. For the software side, see pre-incident planning.

The template

1. Identification

Plan number
Occupancy name
Address and cross streets
Response zone / first-due station
Occupancy type and use
Normal occupant load (day / night)
Date prepared / prepared by
Last reviewed / next review due

2. Contacts

3. Building construction

4. Fire protection systems

SystemPresent (Y/N)CoverageLocation of controls
Automatic sprinklersRiser room:
Fire department connection (FDC)Serves:FDC location:
StandpipesClass:Outlets:
Fire pumpPump room:
Fire alarmPanel / annunciator:
Special suppression (clean agent, kitchen hood, foam)
Smoke controlControl panel:
Elevators / fire service recallMachine room:

5. Utilities and shutoffs

6. Hazards

7. Water supply

Hydrant IDLocationMain sizeLast flow test (date, available flow)

Alternative water sources (drafting sites, tanks) and required fire flow if calculated. Flow test results come from the hydrant flow test form.

8. Access and staging

9. Tactical considerations

10. Attachments

Pre-incident plan example (abbreviated)

Example: Two-story mercantile, Type V construction with lightweight wood trusses. Sprinklered throughout; riser room at the rear (Side C) door; FDC on Side A beside the main entrance. Alarm panel inside the Side A vestibule. Gas meter and electric disconnect on Side D. Propane cylinders for forklifts stored in a cage on Side C. Nearest hydrants at the Side A curb and across the street. Staging in the front parking lot; aerial setup on Side A. Truss roof: avoid roof operations once fire involves the attic.

Keeping preplans current

Preplans age quickly when a tenant changes, a system is impaired or a hydrant is taken out of service. Linking each plan to the occupancy's inspection record and the hydrant inventory keeps them aligned. In Elarchon, pre-incident plans, inspections and hydrants share one record, and plans are available on apparatus devices through the offline field app.

Questions

What is a pre-incident plan?

A pre-incident plan, or preplan, is a document prepared before an emergency that records the building, its occupants, hazards, fire protection systems, water supply and access, so responding crews can make faster, safer decisions.

What should a pre-incident plan include?

Occupancy and contact details, construction and building features, fire protection systems and their controls, hazards, utilities and shutoffs, water supply, access and staging, and tactical considerations, plus a site plan and, where useful, floor plans and photos.

Which NFPA standard covers pre-incident planning?

NFPA's pre-incident planning requirements, formerly NFPA 1620, are now part of NFPA 1660. Check NFPA's site for the current edition your agency follows.

How often should preplans be updated?

Set a review cycle in policy, commonly tied to the inspection cycle for the occupancy, and update the plan whenever an inspection or permit shows a change in use, systems or hazards.

Should preplans be on the apparatus?

Yes. A preplan is only useful if the crew can see it en route and on scene, so it should be available on apparatus devices and work without a data connection.

Sources

  1. NFPA 1660 (incorporating pre-incident planning, formerly NFPA 1620) National Fire Protection Association
  2. Public Protection Classification (PPC) ISO / Verisk

Request a briefing

See Elarchon configured for your jurisdiction.

Briefings are prepared around your departments, incident types and reporting obligations.

Request a briefing